New Bridge for Worth School

Bridge2

Outline planning approval has been granted for a new pedestrian footbridge in timber at Worth School. The bridge once erected this summer will provide safe access across the busy B2110 road that separates the sports pitches from the main school. The bridge is located in The High Weald AONB and had to be designed so that its impact on the visual amenity of the locality was minimised. Miller Bourne worked closely with Tully De’Ath, the school’s structural engineers to arrive at a proposal that met with local planning policies.