Miller Bourne was appointed in 2012 to develop proposals for a Learning Resources Centre to include 14No teaching spaces, dedicated ICT rooms and a library / study centre.
Located within the heart of the historic campus the three storey building was successfully completed in Summer 2015 and combines a mix of contemporary design with traditional materials. This classroom/library building sits within the Grade II* listed campus of Christ’s Hospital School and was the winning scheme from a design lead competition to select Architects.
Procurement
Pre-construction Phase - Concept design and planning consent for client. Construction phase - Architect for D&B contractor.